Go to CS2103/T main site
  • Dashboards home
  • Participation dashboard
  • Forum dashboard
  • iP progress
  • iP comments
  • iP Code
  • tP progress
  • tP comments
  • tP Code
  • tP progress dashboard

    • Details about tP grading are here.
    • Note that the progress shown here is just a rough guidance as it was generated by an automated script. A human inspection will be done after the final submission to confirm the script's findings.
    • Meaning of colors/icons:
      • : you can click on this icon to find more info
      • ABC : you have done the corresponding item.
      • ABC : you have done the corresponding item which is an optional item (well done!).
      • ABC : item overdue, you have not done the corresponding item yet.
      • ABC : item due soon, not done yet.
      • ABC : optional item due soon, not done yet.
      • The [?] suffix (e.g., ABC [?]) indicates there are no data for that item yet. It will be updated in a later time when the relevant data are available.
    • If you have queries about the data shown in this page, please email cs2103@comp.nus.edu.sg.

    [This page was last updated on Oct 23 2020]

    Team IDTeam The current CI status as generated by GitHub actionsCI Status i.e., tP tasks to be done by the whole teamTasks
    CS2103T-W10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-W14-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-W14-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-W14-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-W14-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W15-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W15-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W15-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W15-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W16-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W16-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W16-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W16-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W17-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W17-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W17-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-W17-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T09-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T09-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T09-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T09-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T14-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T14-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T14-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T14-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T15-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T15-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T15-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T15-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T16-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T16-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T16-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-T16-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T17-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T17-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T17-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-T17-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F09-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F09-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F09-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F09-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F10-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F10-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F10-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103-F10-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F11-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F11-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F11-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F11-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F12-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F12-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F12-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F12-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F13-1 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F13-2 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F13-3 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released
    CS2103T-F13-4 weekly meetingproduct conceptuser storiesForkedIssues EnabledDocs PublishedPR CreatedUG draftv1.1 set upwebsite adaptedUG adaptedDG adaptedv1.1 wrap upv1.2 wrap upv1.2 demov1.3 set upassertions enabledv1.3(trial) releasedv1.3 wrap upv1.3 released

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) No
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-W14-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) No
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W15-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W16-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) No
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-W17-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T09-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T14-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T15-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) No
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-T16-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) No
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-T17-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F09-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too Yes
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103-F10-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 No
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F11-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F12-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-1.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-2.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-3.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No

    tP Team Tasks

    activity week description status
    weekly meeting 3 Set up a weekly meeting time Yes
    product concept 4 Submitted product concept via TEAMMATES Yes
    user stories 5 Brainstormed at least 20 user stories Yes
    Forked 6 Forked the tp repo from the module org to the team org Yes
    Issues Enabled 6 Issue tracker enabled in the team repo Yes
    Docs Published 6 docs have been published via GitHub pages e.g. https://AY2021S1-CS2103T-F13-4.github.io/tp/UserGuide.html Yes
    PR Created 6 Created a PR from team fork to upstream repo Yes
    UG draft 6 UG draft of reasonable quality submitted to LumiNUS Yes
    v1.1 set up 7 milestone v1.1 is present and has a deadline Yes
    website adapted 7 README, AboutUs, and _config.yml have been updated Yes
    UG adapted 7 AB3 UG has been adapted to the new product (no traces of AB3 left) Yes
    DG adapted 7 AB3 DG: Requirements sections have been updated (product scope, user stories, use cases, NFRs, etc.) Yes
    v1.1 wrap up 7 milestone v1.1 is closed, and all its issues are closed too Yes
    v1.2 wrap up 9 milestone v1.2 is closed, and all its issues are closed too Yes
    v1.2 demo 9 Added screenshots of v1.2 to the project notes document Yes
    v1.3 set up 10 milestone v1.3 is present and has a deadline Yes
    assertions enabled 10 Assertions enabled in the team repo (in build.gradle) Yes
    v1.3(trial) released 10 Released v1.3(trial) jar file on GitHub in period Oct 18 2020 to Oct 24 2020 Yes
    v1.3 wrap up 11 milestone v1.3 is closed, and all its issues are closed too No
    v1.3 released 11 Released v1.3 jar file on GitHub in period Oct 26 2020 to Oct 30 2020 No
    Student number (partial)Student i.e., weeks in which some code was committed to the repoWeekly progress i.e., other tP-related individual tasksIndividual tasks
    A0117428_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150036_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150061_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0159922_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0166931_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0167650_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0167817_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0168050_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0168635_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0170547_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0177871_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0177873_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0180014_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0180324_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0183080_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0183548_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0183569_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184524_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184537_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0185084_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0187381_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0188036_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0188189_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0189525_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0189606_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0190134_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0190241_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194088_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194496_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194526_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194532_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194541_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194562_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194563_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194566_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196511_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196574_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196612_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196660_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197077_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197079_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197135_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199347_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199366_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199369_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199464_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199741_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199809_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199832_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200162_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200177_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200393_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200559_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200603_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200700_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200760_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200765_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200794_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200813_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200835_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200908_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201181_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201191_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201327_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201764_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201775_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201835_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201915_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201975_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202092_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202284_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202348_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204208_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204705_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204750_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204752_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204754_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204950_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205204_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205232_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205369_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205371_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205424_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205497_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205504_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205575_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205601_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205607_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205742_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205794_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206131_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206170_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206353_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206358_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206368_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0208035_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0135448_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0135451_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0146240_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149796_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149802_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149836_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149859_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149884_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149947_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149980_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0149989_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150008_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150022_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150025_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150034_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150038_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150048_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0150099_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0161202_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0164623_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0169843_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0177473_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0178059_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0180058_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0180061_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0180092_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0182726_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0183151_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0183534_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184014_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184257_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184411_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0184678_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0187434_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0187737_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0187858_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0189168_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194484_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194487_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194488_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194489_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194512_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194516_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194567_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194568_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0194569_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196491_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196510_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196539_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196545_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196583_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196589_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196600_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196608_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196616_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196626_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196633_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196634_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196650_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196680_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196683_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196686_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0196705_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197082_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197215_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197283_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197297_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197310_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197731_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0197768_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199107_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199122_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199123_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199141_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199156_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199164_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199177_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199179_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199220_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199248_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199262_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199317_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199340_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199359_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199377_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199395_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199397_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199399_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199420_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199424_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199443_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199451_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199476_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199477_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199502_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199508_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199522_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199537_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199554_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199556_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199568_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199574_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199579_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199596_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199624_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199627_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199633_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199648_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199730_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199753_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199758_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199760_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199761_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199769_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199770_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199776_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199786_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199799_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199811_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199815_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199885_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199890_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199902_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199922_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199926_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199971_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199974_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0199994_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200001_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200007_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200025_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200044_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200054_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200076_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200112_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200116_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200117_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200119_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200134_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200152_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200161_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200175_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200190_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200204_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200223_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200498_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200534_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200541_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200593_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200618_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200643_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200657_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200668_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200670_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200673_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200676_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200678_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200679_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200682_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200687_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200691_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200698_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200718_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200732_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200739_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200750_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200751_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200761_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200766_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200777_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200778_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200783_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200788_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0200801_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201182_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201185_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201189_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201229_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201233_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201293_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201367_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201406_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201417_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201446_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201480_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201495_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201575_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201614_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201640_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201706_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201715_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201725_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201733_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201747_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201768_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201829_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201836_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201838_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201841_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201847_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201866_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201889_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201920_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201924_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201926_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201958_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0201976_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202017_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202062_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202132_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202170_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202181_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202395_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202720_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202788_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0202811_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204671_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204679_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204683_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204700_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204707_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204713_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204718_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204722_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204736_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204740_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204771_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204777_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204786_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204812_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204817_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204827_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204838_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204839_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204848_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204851_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204867_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204878_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204879_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204884_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204885_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204888_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204927_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204973_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0204978_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205011_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205049_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205056_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205068_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205103_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205111_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205116_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205128_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205129_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205141_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205150_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205172_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205196_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205216_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205235_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205253_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205260_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205280_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205295_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205302_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205306_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205314_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205315_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205333_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205344_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205471_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205496_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205502_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205519_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205520_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205565_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205578_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205615_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205668_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205671_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205672_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205678_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205680_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205682_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205721_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205748_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205773_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205792_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205812_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205825_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205876_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205877_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205878_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205879_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205882_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205883_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205928_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205934_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0205983_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206006_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206010_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206020_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206022_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206031_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206050_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206095_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206096_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206124_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206151_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206153_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206160_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206191_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206249_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206311_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206330_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206332_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206345_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206350_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206377_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206380_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206403_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206418_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206420_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0206443_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0207959_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0207963_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0207967_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0207999_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0208003_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0208026_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0208036_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0210908_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211301_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211307_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211553_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211628_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211714_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsLoggingDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]
    A0211899_ 7891011 ForkedTutorialv1.1 Issuesv1.1 PRsphotov1.2 Issuesv1.2 PRsSmoke-tested CATcherAssertionsDG Draft [?]v1.3 Issuesv1.3 PRsUG Draft [?]

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 46 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 40 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 12 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 36 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 51 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 13) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 17) Yes
    Logging 10 Used logging in the code (found: 34) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 19) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 30 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 19 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 42 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 12 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 44 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 56 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 45 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 48 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 28 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 29 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 56 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 42 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 24 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 47 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name No
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 24) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 72 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 71 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 20 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 9 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 77 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 16) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account No
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 65 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 22 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 12 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 49 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 44 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 49 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 22 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 38 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 23 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 37 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 13 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 33 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 42 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 10 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 52 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 122 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 36 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 61 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 84 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 64 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 32 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 17 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 84 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 84 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 92 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 9 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 24 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 55 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 22) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 71 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 65 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 9 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 17 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 38 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 33 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 36 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 45 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 39 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 13) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 32 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 28 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 23 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 10 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 15 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 54 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 55 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 13 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 49 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 60 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 31 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 58 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 41 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 24 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 23 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 46 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 45 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 74 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 101 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 18 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 11) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 72 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 20) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 60 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 10 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 59 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 41 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 20 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 46 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 53 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 41 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 1 commit to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 14 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 50 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 18 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Did not contribute any commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 46 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 27 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 33 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 36 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 30 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 40 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 14 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 16 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 47 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 38 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 39) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 33 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 57 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 47 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 40 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 34 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 34 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 45 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 52 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 13 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 13 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 11 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 39 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 141 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 12) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 36 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 17 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name No
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 40 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 34) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 3 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 16 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 36 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 15 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 63 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 47 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 51 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 45 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 55 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 31 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 35 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 88 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 17 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 18 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 12 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 25 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 25 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 45 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 53 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 30 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 0 issues) No
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 50 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 37 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 30 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 30 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 7 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 38 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 23 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 14) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 22 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 12 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 97 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 60 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 17 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 6 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 16 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 23) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 8 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 14 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 12 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 29 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 32 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 10 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 12 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 16) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 12 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name No
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 9 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 50 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 17 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 23 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 11) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 52 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 53 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 51 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 9 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 13 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name No
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Did not contribute any commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 6 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 22 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 11 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 7) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 9) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 42 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 25 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 40 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 27 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 55 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 8 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 63 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 30 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 21 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 15 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 25 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 21 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 8 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 38 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 8 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 35 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 13 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name No
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 1 commit to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 15 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 10) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 25 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 16 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 22 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 49 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 28 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 38 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 83 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 5 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 23 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 9 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 17 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 11 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 37 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 14 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 21 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 29 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 18 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 53 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 33 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 7 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 35 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 56 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 15 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 5 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 28 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 34 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 79 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 19 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 23 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 45 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 11 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 8 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 7) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 15 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 2 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 10 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 0 PRs) No
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 24 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 46 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 10 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 3 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 20 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 0 issues) No
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 27 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 1 commit to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 16 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 5) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 3 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 5 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 22 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 41 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 4 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 8) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 13 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 7 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 24 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 10 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 16 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 20 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 32 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 8 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 9 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 16) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 7 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 7 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 29 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 2 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 1 commit to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 6 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 2 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 3 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 13 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 32 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 27 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 17 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 10) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 7 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 11 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 25 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 34 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 26 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 18 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 8 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Did not contribute any commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 26 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 14 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 10 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 30 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 9 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 21 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 19 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 6 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 18 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 6 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 11 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 28 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 6 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 6 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 2 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 5 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 4 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 9 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 39 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 6 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 34 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 37 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 62 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 4) Yes
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 2 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 12 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 5 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 14 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 20 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 4 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 1 commit to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 7 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 18 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 44 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 16 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 7 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 8 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 8 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 7 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 2 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 24 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 26 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 39 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 4 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 5 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 9 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 15 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 5 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 49 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 19 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 6 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    Logging 10 Used logging in the code (found: 4) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 5 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 14 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 11 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 31 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 12 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 2 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 1 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 5 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 0 PRs) No
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 17 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 17 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 10 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 11 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 1) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 29 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 9 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 19 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 17 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 9 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 8 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 5 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 6) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 4 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 19 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 20 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 7 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 13 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 5 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch No
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 2 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 3 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 2 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher No
    Assertions 10 Used asserts in the code (found: 0) No
    Logging 10 Used logging in the code (found: 13) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 0 issues) No
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 4 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 12 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 16 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 31 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Contributed 6 commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 6 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 2 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 19 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 11 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 8) Yes
    Logging 10 Used logging in the code (found: 9) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 14 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 12 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 7 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 15 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 3 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 8 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 0 PRs) No
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 2 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 4 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 2) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 1 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 11 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Contributed 4 commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 39 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 22 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 4 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 3 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 3 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 3) Yes
    Logging 10 Used logging in the code (found: 3) Yes
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 4 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 3 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet

    tP Weekly Progress

    • Week 7 Sep 18 2020 - Oct 01 2020: Contributed 10 commits to the master branch of the team repo
    • Week 8 Oct 02 2020 - Oct 08 2020: Did not contribute any commits to the master branch of the team repo
    • Week 9 Oct 09 2020 - Oct 15 2020: Contributed 12 commits to the master branch of the team repo
    • Week 10 Oct 16 2020 - Oct 22 2020: Contributed 4 commits to the master branch of the team repo
    • Week 11 Oct 23 2020 - Oct 29 2020: Did not contribute any commits to the master branch of the team repo

    tP Admin Tasks

    activity week description status
    Forked 6 Forked team repo to own GitHub account Yes
    Tutorial 7 Created a PR from the tutorial-adding-command branch Yes
    v1.1 Issues 7 Has GitHub issues assigned (and closed) in milestone v1.1 (found: 3 issues) Yes
    v1.1 PRs 7 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.1 (found: 1 PRs) Yes
    photo 7 Uploaded own photo (or placeholder image) with the correct file name Yes
    v1.2 Issues 9 Has GitHub issues assigned (and closed) in milestone v1.2 (found: 1 issues) Yes
    v1.2 PRs 9 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.2 (found: 1 PRs) Yes
    Smoke-tested CATcher 10 Smoke-tested CATcher, created some dummy issues using CATcher Yes
    Assertions 10 Used asserts in the code (found: 0) No
    DG Draft [?] 10 Added draft design descriptions to the DG No data yet
    v1.3 Issues 11 Has GitHub issues assigned (and closed) in milestone v1.3 (found: 3 issues) Yes
    v1.3 PRs 11 Authored PRs (merged, followed the forking workflow e.g., PR used a separate branch) in milestone v1.3 (found: 1 PRs) Yes
    UG Draft [?] 11 Added some content to the UG in week 11 No data yet